{"id":1446,"date":"2025-10-26T21:24:14","date_gmt":"2025-10-26T21:24:14","guid":{"rendered":"https:\/\/royalenergys.com\/?p=1446"},"modified":"2025-12-17T00:40:24","modified_gmt":"2025-12-17T00:40:24","slug":"producao-e-distribuicao-de-energia","status":"publish","type":"post","link":"https:\/\/royalenergys.com\/en\/servicos\/producao-e-distribuicao-de-energia\/","title":{"rendered":"Energy Engineering and Procurement"},"content":{"rendered":"<p>Our experience includes the design and management of thermal power plants in Angola (Cabinda \/ Quileva-Lobito \/ Luanda \u2013 CFL \u2013 Morro Bento and Camama, with a combined capacity of: Cabinda (4x35MW) \/ Quileva (6x21MW) \/ CFL (5x22.5MW) \/ Morro Bento (2x22.5MW) \/ Camama (4x22.5MW), supervision of substations in Portugal and Angola, and electrification of industrial sectors. Royal Energy Ltd. carries this proven track record into a future where resilient grids and reliable generation remain essential.<\/p>","protected":false},"excerpt":{"rendered":"<p>A nossa experi\u00eancia inclui a concep\u00e7\u00e3o e dire\u00e7\u00e3o de centrais t\u00e9rmicas em Angola (Cabinda \/ Quileva-Lobito \/ Luanda \u2013 CFL &#8211; Morro Bento e Camama, com capacidade combinada de: Cabinda (4x35MW) \/ Quileva (6x21MW) \/ CFL (5&#215;22,5MW) \/ Morro Bento (2&#215;22,5MW) \/ Camama (4&#215;22,5MW), supervis\u00e3o de subesta\u00e7\u00f5es em Portugal e Angola, e eletrifica\u00e7\u00e3o de setores [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":407,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-1446","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-servicos"],"_links":{"self":[{"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/posts\/1446","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/comments?post=1446"}],"version-history":[{"count":3,"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/posts\/1446\/revisions"}],"predecessor-version":[{"id":1846,"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/posts\/1446\/revisions\/1846"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/media\/407"}],"wp:attachment":[{"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/media?parent=1446"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/categories?post=1446"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/royalenergys.com\/en\/wp-json\/wp\/v2\/tags?post=1446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}